ClickUp Line Chart Card: Time on the X-Axis
How the ClickUp line chart card keeps time on the x-axis, which y-axis measures Help lists, and which plan includes the card.
By AIStackMatch Editorial · Updated · 9 min read
Some links on AIStackMatch are affiliate links. We may earn a commission if you purchase or sign up through them, at no additional cost to you. Read our affiliate disclosure.
Short answer
The ClickUp line chart card is a custom chart whose x-axis is always Time or Dates, including Date Custom Fields. You pick the y-axis measure, an optional group, and whether the line shows the level or the change per day. The catalog lists it as an advanced card on Business and above, on Dashboards and Overviews, not on Home.
The ClickUp line chart card is the custom line, and the x-axis is not a choice you can spend on assignee or status. ClickUp Help's line-chart article says the card visualizes changes to data over time, and that line chart cards use Time or Dates on the x-axis to display task data over time. Dates include Date Custom Fields. Status, priority, and assignee belong on the y-axis group, as separate lines, or on a different card.
Status over time is already a line of task counts by status. Priority over time is the line of task counts by priority. Both are advanced cards with a fixed measure. A single number is a calculation card. A bar whose x-axis can be assignee, status, or time is the bar chart card. This page is the custom line. The ClickUp hub links the Dashboard it sits on.
What can the line chart measure?
Add the card from Custom. The settings table splits the axes.
| Axis | Options the line chart article lists | What that list also says |
|---|---|---|
| X-axis measure | Time, or Dates including Date Custom Fields | The card always displays task data over time |
| X-axis time range | All available dates, This year, This month, This week, Rolling period, or Range | The table does not define the rolling length |
| X-axis group by | Days, Weeks, or Months | This is the time scale, not a task field |
| Y-axis measure | Tasks, Time Estimate, Time Tracked, average age of tasks, sprint points, custom fields, formula fields | The list ends with the line "Must be a number" |
The "Must be a number" line sits after Formula Fields. The article does not attach it to Tasks, Time Estimate, Time Tracked, average age, or sprint points, and it does not publish a separate type rule for Custom Fields. A formula that returns text is a poor match for that closing line. Formula fields is where the expression is written. The card does not give you a second formula box.
Time tracked is the row people mix up with the bar chart. On the bar, Time Tracked is a y-axis measure only when the x-axis is not Time. The line chart article does not repeat that sentence. Its x-axis is always Time or Dates, and Time Tracked is still in the y-axis list. A different article, Time Tracked in Dashboards, says Time Tracked is available on bar, pie, and battery cards, and its table does not name Line Chart. Both pages are official. If the y-axis dropdown on the card you open includes Time Tracked, that option is the line chart table. If it does not, the Time Tracked article never promised this card. Do not import the bar chart's block.
Y-axis group by draws separate lines, or stacked areas, for a field. You cannot group by the same field you are using as the y-axis measure. The options are None, Assignee, custom fields, Dates, formula fields, Priority, Status, Status type, Tags, and Task type. Help's example: grouping by Status shows the total number of tasks on the y-axis, in each status, on a given date on the x-axis. That example assumes the y-axis is a count. Status type is a group-by label. The article does not add a second control called Status group on this card. The bar chart has Status group on its x-axis. Leave it there.
There is a switch for tasks that have no value in the group-by field. Help's example is grouping by Assignee and including unassigned tasks. Leave it off and those tasks are out of the lines. The switch does not assign anyone.
The custom-cards article says you can group a line chart by a custom task type, and its example is Milestones. The settings table's matching option is Task type. The article does not add a Milestones-only toggle. ClickUp milestones is the task type. This card only plots it if you group by that type.
How do you chart the change, not the level?
Plot the change in values sits on the y-axis. Help says it displays the amount of change per day as the y-axis value. The worked example is the same shape as the bar chart's, and it is written on this article too: 0 tasks in progress on Monday, 5 on Tuesday, 3 on Wednesday. With the setting on, the y-axis shows 5 for Tuesday and -2 for Wednesday. The article calls that the amount of change per day. It does not say Wednesday's -2 is a defect. It is the drop from five to three.
The example is three weekdays. The article does not publish a weekly or monthly version of those numbers. If you group the x-axis by Weeks or Months, this guide does not invent a new unit. The setting's own words stay "per day."
Read a negative point as a decrease against the previous point, then decide whether the meeting wanted the level or the change. The level is the chart with this setting off. Display as a stacked area shows y-axis values as a stacked area differentiated by color. Show legend shows the color and value of each y-axis group-by option. Neither switch changes the measure.
The line chart settings table has no sort row. The time-based cards article lists Line Chart as a time-based card, and it says the only sort for time-based cards is Default, dates from oldest to newest. Do not look for the bar chart's Alphabetical or Values sort on this card. Those options are not in the line chart table.
Which time range applies, and what is included?
The line chart table lists six time ranges, including All available dates. The time-based cards article defines them for the cards in its list, and Line Chart is in that list:
| Time range | What the time-based article says |
|---|---|
| All available dates | Dates based on the available task data |
| This year | The current calendar year |
| This month | The current calendar month |
| This week | The current calendar week |
| Rolling period | A relative range of 1 to 365 days, which keeps reporting that same length |
| Range | A custom range of dates |
The 1-to-365 length is that article, not a number printed in the line chart settings table. A second page, about using date fields, lists Line Chart's x-axis time range as This year, This month, This week, Rolling period, and Range. That row does not repeat All available dates. The card's own table does. If the control you open is missing All available dates, you are looking at the shorter list from the date-fields page, not a setting this guide should invent.
That date-fields page also adds a Step of Days, Weeks, or Months when a date is the y-axis group-by. The line chart settings table lists Dates as a y-axis group-by option and does not publish a Step row. Use the step if the card shows it after you pick a date. Do not copy it onto a Status group-by.
Location is Spaces, Folders, Subfolders, and Lists. Three include switches sit under it. Include Subtasks says "from the selected locations." Include Tasks in Multiple Lists includes tasks added to those locations. Include Subtasks in Multiple Lists does the same for subtasks. The line chart article does not say nested subtasks are excluded, and it does not say the switch is first-level only. That first-level sentence is on the bar chart article. It does not travel.
Show closed includes closed tasks. Show archived includes archived tasks. The Filter row applies filters so the card shows tasks that currently meet the criteria. The time-based article adds three rules for every card in its list. The filter keeps tasks that currently meet the criteria. Historical data supplies the y-axis points along the x-axis. A filter type that no longer exists, such as a deleted status, still applies, because the history captured the task in that status. The worked example on that page is a Priority Over Time card, August 22 and August 23, not a screenshot of this line. The rules are attached to the list that includes Line Chart. The example is not.
Dashboard filters can apply to this card. The filters article lists Line Chart with the other custom cards: Bar, Battery, Calculation, and Pie. You can combine a Dashboard filter with a card filter. The filters article's mixed-filter example uses a Calculation card. The catalog's mixed-filter ban names time tracking cards and table cards. It does not name Line Chart.
Drill-down is not in the line chart article. The drill-down article lists Line Chart, and it says drill-down is not supported on a line chart when Plot the change in values is on. On a time-based card, the drill-down shows only the task name, the assignee, and the priority. Only the current name is shown. Help's example: a task that was Task A for weeks, renamed today to Task B, appears as Task B on a line chart drill-down. Click a point to open it. With the change plot on, do not expect the list.
Sprint points on the y-axis are the points field, not the Sprint Velocity card. Average age is a measure on this list. It is not the cycle time card, and it is not work item age from the Kanban Guide.
Which plan includes the line chart, and how do you add it?
| Plan | Line Chart card |
|---|---|
| Free Forever | No |
| Unlimited and Core | No |
| Business | Yes |
| Business Plus | Yes |
| Enterprise and Max | Yes |
The canvas table puts it on Dashboards and Overviews, not on Home. Export is standard formats: PDF, PNG, JPEG, SVG, or CSV. Cards export only on Business and above. This card already starts on Business, so the export plan and the card plan are the same floor. Dashboards is the use cap for the canvas. The cap does not unlock the card.
Prices checked October 2026: Free Forever is $0, Unlimited is $7 per user per month billed annually ($10 monthly), and Business is $12 per user per month billed annually ($19 monthly). Enterprise is custom. Our price table does not list a Core or Business Plus dollar amount. See ClickUp pricing.
Add steps from the article:
- Create a new Dashboard or open an existing one.
- In the upper-right corner, click + Add card.
- From the left sidebar, select Custom.
- Click Line Chart card.
- Configure the card settings.
- In the upper-right, click Add card.
| Question | Card that matches the docs |
|---|---|
| How many tasks sat in each status over time, as a fixed line? | Status Over Time, on Business |
| How did the priority mix move, as a fixed line? | Priority Over Time, on Business |
| One sum, average, or count | Calculation, on Business |
| A line whose y-axis you choose, with time always on the x-axis | This card, on Business |
Set the location first, then the time range, then the y-axis. If the meeting wants the level of work, leave Plot the change off. If it wants the rise and fall, turn it on and expect a negative point when the count drops. The preset lines answer a fixed question with fewer settings. This card is the one you build when those presets do not ask your question, and when the x-axis has to stay a date.
ClickUp
All-in-one work management for tasks, docs, goals and team collaboration, with a generous free plan.
Affiliate link. We may earn a commission at no extra cost to you. Read our affiliate disclosure
Frequently asked questions
What is the ClickUp line chart card?
Help calls it a custom Dashboard card that visualizes changes to data over time. The x-axis is always Time or Dates, including Date Custom Fields. The y-axis is the measure you choose.
Which plan includes the line chart card?
The catalog lists Line Chart as an advanced card: no on Free Forever and on Unlimited and Core, yes on Business, Business Plus, and Enterprise and Max. It is on Dashboards and Overviews, not on Home.
Can the line chart show time tracked?
The line chart settings table lists Time Tracked as a y-axis measure, with no sentence that blocks it when the x-axis is Time. A separate Time Tracked article lists bar, pie, and battery, and does not name Line Chart.
Does Include Subtasks add nested subtasks?
The line chart article says Include Subtasks includes subtasks from the selected locations. It does not repeat the bar chart's first-level-only sentence. This guide does not add that limit.
Can you export a line chart?
Yes, on Business and above, which is also the plan that includes the card. The catalog lists Line Chart under standard formats: PDF, PNG, JPEG, SVG, or CSV.