How-to

How to Run a Sprint Retrospective

What a sprint retrospective is for, how long the Scrum Guide allows, a sample agenda, and how to keep the notes and actions in ClickUp.

By AIStackMatch Editorial · Updated · 7 min read

Some links on AIStackMatch are affiliate links. We may earn a commission if you purchase or sign up through them, at no additional cost to you. Read our affiliate disclosure.

Short answer

A sprint retrospective is the meeting at the end of a sprint where the team chooses how to work better next time. The Scrum Guide caps it at three hours for a one-month sprint. Store the notes in a Doc and turn one or two actions into tasks.

A sprint retrospective is the last meeting of the sprint, and it is about the work system, not the feature demo. The Scrum Guide, published at scrumguides.org, states the purpose in one line: plan ways to increase quality and effectiveness. The team looks at how the last sprint went, names what helped and what hurt, and leaves with a change it will try next. If the meeting ends with a long list and no owner, it was a conversation, not a retrospective.

What the time box itself is, including ClickUp's usual one to two weeks, is in what is a sprint. The ordered list the improvements come back to is in what is a backlog. The ClickUp hub links the tool side.

What is a sprint retrospective?

The Scrum Guide puts four topics on the table: individuals, interactions, processes, tools, and the team's Definition of Done. Which of those matters will change with the work. A support team might spend the time on handoffs. A product team might spend it on a Definition of Done that let unfinished work into the review.

The same section asks the team to discuss what went well, what problems it hit, and how those problems were or were not solved. It also asks the team to look at assumptions that led them astray. That is the whole official agenda. Formats with columns named Start, Stop, and Continue are a way of holding that conversation. They are not a second standard.

The output is a small set of changes. The Scrum Guide says the team identifies the most helpful ones, addresses the most impactful as soon as possible, and may put them on the Sprint Backlog for the next sprint. "As soon as possible" can mean this week, not the next planning day. A retro that only writes slogans does not meet that bar.

Two neighboring meetings get mixed up with this one. The Sprint Review looks at the increment with stakeholders. The Scrum Guide timeboxes that review at a maximum of four hours for a one-month sprint, and calls it the second to last event. The retrospective comes after it and closes the sprint. The Daily Scrum is the short planning check during the sprint. None of the three replaces the others. Kanban vs Scrum is the longer comparison if the team is not sure it wants a sprint at all. A Kanban team can still hold a regular improvement meeting. It just does not have a sprint boundary to hang it on.

How long should the retrospective be?

The only number the Scrum Guide sets is a maximum: three hours for a one-month Sprint. Shorter sprints usually get a shorter event. It does not publish a required length for a two-week sprint. A team that needs the full three hours every two weeks is usually relitigating the sprint, not inspecting it.

Keep the meeting inside the sprint. The guide says the retrospective concludes the sprint. Holding it three days later, after the next sprint has already started, means the improvements miss the backlog they were supposed to join.

People who were in the work should be in the room. The guide assigns the inspection to the Scrum Team. A stakeholder demo belongs in the review. A manager readout belongs in neither, unless that person is part of the team. The useful constraint is the same one as the timebox: fewer attendees, a shorter list of changes.

What does a sample agenda look like?

This agenda is a sample for a two-week sprint. The minutes are not from the Scrum Guide. They are one way to cover its topics without filling the three-hour cap. Shift them if a single incident deserves the room.

MinutesTopicWhat "done" looks like
0 to 5PurposeSomeone says the meeting is about how the team worked, not a second demo
5 to 15What went wellA few specifics, tied to a task or a decision, not a round of praise
15 to 30ProblemsWhat hurt, and whether it was actually solved during the sprint
30 to 40AssumptionsOne belief that turned out to be wrong, if there was one
40 to 50ChangesOne or two improvements, each with an owner
50 to 55Next sprintThose actions land on the next Sprint Backlog, or the team declines them out loud

Stop at two actions. A third one is usually the action nobody will touch. If the sprint's only real problem was a tool failure or a missed Definition of Done, spend the middle of the meeting there and skip the tour of every ticket.

Bring the sprint List, not a slide. The board shows what rolled, what sat in review, and who was overloaded. Opinions that contradict the board are still allowed. They should have to argue with it.

How do you store the notes in ClickUp?

ClickUp does not have a separate retrospective product. The Sprints ClickApp gives you the sprint List. The notes belong in a Doc beside it. Docs are on every plan. Help's article on creating a task from a Doc says guests cannot create Docs, so a member opens the page and shares it with anyone else who should see the notes. The Doc guide is ClickUp Docs.

A workable page is short:

  • Sprint name and dates.
  • What went well, as bullets tied to real tasks.
  • Problems, including whether they were solved.
  • The one or two changes, each with an owner.
  • A link to the next sprint List.

Create the action from the Doc instead of retyping it. Highlight the line, use the task control on the text toolbar, and create the task. Help says the task name fills in from the selected text. If the Doc lives in Docs Hub rather than inside a List, you pick a location in the create window. Put the task on the next sprint List, or on the backlog if it is larger than one sprint. ClickUp sprints covers how that List is created. What is a backlog covers the waiting area. Do not bury the action in the Doc only. The Scrum Guide's allowance is to add the improvement to the Sprint Backlog, which in ClickUp is a task on a List, not a paragraph.

Sprint points and the burndown card are optional context, not the meeting. Points include 100 uses on Free Forever and Unlimited, and the burndown and velocity cards start on Business. Prices checked October 2026: Unlimited is $7 per user per month billed annually ($10 monthly), and Business is $12 annually ($19 monthly). The caps are in ClickUp sprint points. A retro can run on Free Forever with a Doc and a List. You do not need the chart to notice that review piled up.

If you want the same Doc shape every sprint, save it as a Doc template after the first one works. That is a template of headings, not a ClickUp retrospective feature. The template overview is in ClickUp templates.

Write the action as a task you could finish inside the next sprint. "Communicate better" is not a task. "Post the review link on the ticket before asking for QA" is.

Which tool should hold the retrospective?

Use ClickUp when the sprint List, the notes, and the action tasks should be one Workspace. That is the usual case for a small team that also has marketing, support, or client work in the same place. ClickUp for software teams shows the sprint setup around that Doc. The product is configurable enough to become noisy. Keep the retro Doc to the headings above and leave the rest of the ClickApps off.

Use Jira when the team is almost entirely engineers and already runs the backlog there. Our data lists backlogs, sprints, and agile reports such as burndown and velocity, with a free plan for up to 10 users and Standard from about $7.91 per user per month. Prices checked October 2026. The comparison is ClickUp vs Jira. The retrospective still needs a written record. Jira will not produce that record just because the sprint exists.

Use a simpler board, such as Trello, when you do not run sprints. A retro pasted onto a Kanban board tends to become another column nobody opens. The meeting is justified by the sprint boundary. Without that boundary, a shorter weekly check is enough.

Run the first retrospective with the sample agenda, two actions, and a Doc. After two sprints you will know whether the actions were finished. That result is the only measure that matters. A polished board of last sprint's feelings is not.

ClickUp

All-in-one work management for tasks, docs, goals and team collaboration, with a generous free plan.

Affiliate link. We may earn a commission at no extra cost to you. Read our affiliate disclosure

Frequently asked questions

What is a sprint retrospective?

The Scrum Guide says its purpose is to plan ways to increase quality and effectiveness. The team looks at how the last sprint went, including people, process, tools, and the Definition of Done.

How long is a sprint retrospective?

The Scrum Guide timeboxes it to a maximum of three hours for a one-month Sprint. For a shorter sprint, the event is usually shorter. A two-week team does not need the full three hours.

Is the retrospective the same as the sprint review?

No. The Sprint Review looks at the increment. The retrospective looks at how the team worked. The Scrum Guide says the review is the second to last event, and the retrospective concludes the sprint.

What should a retrospective produce?

A few changes the team will actually try. The Scrum Guide says the most useful improvements are addressed as soon as possible, and they may be added to the next Sprint Backlog.

Where should a small team keep retrospective notes?

In the same place as the sprint. In ClickUp that is a Doc next to the sprint List, with action lines turned into tasks. Jira fits a software team that already lives in a dedicated issue tracker.