ClickUp Cumulative Flow: Work at Each Stage

How a ClickUp cumulative flow chart shows work at each status over time, which plan includes the card, and why the documented chart is a legacy card.

By AIStackMatch Editorial · Updated · 7 min read

Some links on AIStackMatch are affiliate links. We may earn a commission if you purchase or sign up through them, at no additional cost to you. Read our affiliate disclosure.

Short answer

A ClickUp cumulative flow chart shows how much work sits at each stage over a time range, with a color per status so a widening band can point to a bottleneck. The calculation article is the legacy Sprint Cumulative Flow card. Sprint cards start on Business, and custom sprint lengths do not work with legacy sprint cards.

A ClickUp cumulative flow chart is a stacked picture of where work sits, not a single line of how much is left. ClickUp Help's Sprint Cumulative Flow card shows the amount of work done at each stage in your sprints, and your task completion progress over time. Tasks are broken into colors based on their current status, so a stage that keeps filling is visible as a widening band. The article that documents the calculation is titled Legacy.

That is a different question from a burnup. ClickUp sprint burnup plots completed work against a scope line for one sprint. What is a burndown chart is the falling remainder. A WIP limit is a color on one Board column, and it does not draw history. Cumulative flow is the chart you open when you want the history of every status, not the forecast for this sprint alone. The Sprint Folder itself is in ClickUp sprints. The ClickUp hub links the setup guides.

What does a ClickUp cumulative flow chart show?

Help calculates the chart with two axes. The y-axis is the progress of work in tasks from the chosen sprint or List, or in tasks with a particular custom field. The x-axis is the time range you selected. The card is always a stacked area. A legend, which shows the color and value of each y-axis group, is optional.

The card is time-based. Help's time-based cards article says these cards use a task's historical data to show the task as it was at different points in time. The cumulative flow article itself says the colors are based on current status. Both sentences are on the Help Center. This guide does not pick one and drop the other. If a band looks wrong after a status rename, check the status group before you treat the picture as a finished report.

Help lists these settings:

SettingWhat Help allows
Source typeSprints, Lists, or tasks with a Label or Dropdown custom field
LocationsSpaces, Folders, Subfolders, and Lists
IncludeSubtasks, tasks in multiple Lists, and subtasks in multiple Lists, each as its own switch
X-axisTime only. Group by days, weeks, or months
Time periodThis year, this month, this week, a rolling period, or a range. If the source is Sprints, the only option is dates that align with the selected sprints
Y-axis measureNumber of tasks, time estimate, average age of tasks, sprint points, or custom fields
Y-axis groupStatus or status type, and you choose which of those to show
FiltersArchived tasks, plus a filter for tasks that currently meet the criteria

Average age is one of those y-axis choices, not a separate card. Help's average-age article says the count starts on the date the task was created and ends when the task is set to Closed, and that it includes tasks in Active, Done, Closed, and Not Started. It also lists legacy sprint cumulative flow as one of the cards that can use that measure. Help's own example is two tasks, created 3 days ago and 5 days ago, for an average age of 4. That is the vendor's arithmetic, not a team result.

A burnup will not show you that Review has been the fat band for two weeks. A burndown can look healthy while tasks pile up in one status, because leaving a task in Review does not add remaining effort if the estimate never changes. Cumulative flow is the chart for that pile.

How do you add a cumulative flow card?

Help's steps:

  1. Create a dashboard or open one you already have.
  2. In the upper right, click + Add card.
  3. From the left sidebar, select Sprints.
  4. Click the Cumulative Flow card.
  5. Configure the settings.
  6. In the upper right, click Add card.

The intro to sprint cards says changes on Burndown, Burnup, Cumulative Flow, Lead time, and Cycle Time update daily at 4:00 am the next day, using your timezone settings. Do not expect this card to redraw the moment someone moves a task. The current Sprint Burnup article describes a real-time update for that card. Cumulative flow is on the daily list, not in that real-time sentence.

The same intro says sprint cards include private tasks in the calculation, and that anyone with access to the Sprint List sees the card with that List's data. Do not put the chart on a dashboard a guest can open if the List holds work they should not see. Guests can be invited to specific dashboards with view-only permissions. The permission on the dashboard is not a filter on each task.

The cards catalog lists Cumulative Flow on Dashboards and on Overviews, and not on Home. It is an advanced card. ClickUp dashboards covers the separate cap on how many dashboards a plan can use. That cap does not turn the card on. A Free Forever Workspace can have dashboards inside its cap and still have no cumulative flow card.

Custom sprint durations cannot be used with legacy sprint dashboard cards. Help's instruction, on the cumulative flow article, is to switch to the newer Sprint Velocity, Burnup, and Burndown cards when the sprint length is custom. Help does not document a non-legacy cumulative flow card to switch to. If your sprints use a custom length, use burnup or burndown for the sprint, and use cumulative flow only on a source that is not a custom-length sprint.

Which plan includes the cumulative flow card?

Two Help tables agree on the plan gate.

PlanSprint Cards, including cumulative flowCumulative Flow in the cards catalog
Free ForeverNoNo
UnlimitedNoNo
CoreNoNo
BusinessYesYes
Business PlusYesYes
Enterprise and MaxYesYes

Sprints themselves are on every plan. The chart is not. Our prices, checked October 2026, list Free Forever at $0, Unlimited at $7 per user per month billed annually ($10 monthly), and Business at $12 annually ($19 monthly). Enterprise is custom. Our price data does not publish a Core, Business Plus, or Max price. Notes are in ClickUp pricing.

Sprint Points are a separate cap: 100 uses on Free Forever and Unlimited, a trial on Core, and unlimited uses on Business and above. You can store points inside that cap and still have no cumulative flow card. Points are in ClickUp sprint points. Status names, which become the colors, are in ClickUp custom statuses.

When is the chart worth opening?

Use it when a status is the thing you argue about. A support queue, a review column, or a QA column that grows for days is the case. A two-person team that only needs a due date does not need the card.

Here is an illustration, not a report from a real team and not a screenshot from ClickUp. The y-axis is a task count. The bands are Not started, Active, and Done.

DayNot startedActiveDone
Monday831
Tuesday752
Wednesday673
Thursday594
Friday4105

Done climbs by about one task a day. Active climbs by about two. The useful sentence on Friday is that work is entering Active faster than it is leaving, not that the team "finished five." A burnup of the same tasks might still look acceptable if the estimates on the Done tasks were large. The sprint task report is the place to see what was added after the sprint was confirmed. Cumulative flow does not replace that tile.

Jira is the closer fit for a software team that already lives in a dedicated tracker and wants agile reports there. Our data lists burndown and velocity on Jira, with a free plan for up to 10 users and Standard from about $7.91 per user per month. Prices checked October 2026. ClickUp vs Jira is the comparison. ClickUp fits when the same Workspace also holds the client folder, the Doc, and the board. Trello is easier if the only need is a simple board. Notion is stronger if the work is mostly documents.

Treat the published cumulative flow card as the legacy card. If the sprint length is custom, Help says that card cannot take it. Use burnup or the velocity card for that sprint, and keep cumulative flow for a source whose dates the card can plot.

Buy Business when someone will look at the bands during the week. Stay on Free Forever or Unlimited if the sprint List and a board are enough. A stacked chart nobody opens is a paid card. A stacked chart that shows Review getting thicker is the reason the card exists.

ClickUp

All-in-one work management for tasks, docs, goals and team collaboration, with a generous free plan.

Affiliate link. We may earn a commission at no extra cost to you. Read our affiliate disclosure

Frequently asked questions

What is a ClickUp cumulative flow chart?

Help's Sprint Cumulative Flow card shows the amount of work at each stage over time. Tasks are colored by status so you can see a bottleneck as work progresses. The calculation article is titled Legacy.

Which ClickUp plan includes cumulative flow?

The cards catalog lists Cumulative Flow on Business, Business Plus, and Enterprise and Max. It is not on Free Forever, Unlimited, or Core. The sprints limits table says the same thing for Sprint Cards as a group.

Does cumulative flow work with a custom sprint length?

No. Help says custom sprint durations cannot be used with legacy sprint dashboard cards. For a custom length, Help points you to the newer Sprint Velocity, Burnup, and Burndown cards.

How is cumulative flow different from a burnup?

Burnup compares completed work with a scope line for one sprint. Cumulative flow stacks work by status across a time range. A rising ceiling is a burnup question. A band that widens in one status is a cumulative flow question.

Where can you put the cumulative flow card?

The cards catalog lists Cumulative Flow on Dashboards and Overviews, and not on Home. Help's add steps start from a dashboard: Add card, Sprints, Cumulative Flow.