How-to
A Project Brief Template You Can Reuse
A project brief template with the sections that keep scope clear, and how to store the brief in a ClickUp Doc next to the task list.
By AIStackMatch Editorial · Updated · 6 min read
Some links on AIStackMatch are affiliate links. We may earn a commission if you purchase or sign up through them, at no additional cost to you. Read our affiliate disclosure.
Short answer
A project brief is a short page that names the outcome, what is in and out of scope, who decides, and how you will know it is done. Store it in a ClickUp Doc, link it to the List, and create tasks from the lines that are real work.
A project brief template saves you from starting every project with a blank page and a vague meeting. The brief answers five questions before anyone builds a board: what outcome, what is in scope, what is out, who decides, and what done looks like. If those lines are missing, the task list will invent them later, usually in a review.
ClickUp can hold the brief in a Doc next to the List that does the work. Docs are on every plan, including for guests. The feature detail is in ClickUp Docs. This page is the template and the habit of writing it once. The ClickUp hub links the setup around it.
What goes in a project brief template?
Keep the headings stable. Change the answers. A brief that uses a new outline every time cannot be compared with the last project, and it cannot become a template.
| Section | Write this | Leave it out |
|---|---|---|
| Outcome | One sentence: what will be true when this is finished | A slogan |
| Why now | The reason the date matters | A history of the company |
| In scope | The deliverables you will produce | Every idea from the kickoff |
| Out of scope | The nearby work you will not do | A polite blank |
| People | One owner, who approves, who is consulted | A list of everyone who was invited |
| Dates | Start, and the checkpoint that means done | A full Gantt pasted into the Doc |
| Done | How you will know the outcome happened | "When the client is happy" with no example |
| Open questions | Decisions that would change scope | Questions you could answer by reading the last project |
Out of scope is the section people skip and later wish they had. "A homepage" can mean a redesign, new copy, and a photo shoot, or it can mean a layout on the current copy. Write the boundary in a sentence. The person approving the brief should be able to disagree with that sentence before work starts.
Dates in the brief are checkpoints, not every task. A project milestone is the right size: design approved, build ready, launched. The tasks that produce the milestone live in the List.
How do you write the brief without bloating it?
Draft in this order. It stops the document from turning into a diary.
- Write the outcome in one sentence. If the sentence needs "and" more than once, you may have two projects.
- List in-scope deliverables as nouns you could hand to someone: homepage, launch email, training Doc. Not "support the team."
- Write three out-of-scope lines. Pull them from the last project that grew. Paid ads, extra languages, and a new logo are common ones. Use the ones that are real for this project.
- Name the owner and the approver. The owner keeps the List current. The approver says the milestone is met.
- Add the date for that milestone and what "done" means in a way you could check. "The page is live at this URL" is checkable. "Feels on brand" is not, unless you point at a brand Doc.
- Park unresolved items under Open questions. Do not hide them inside the outcome sentence.
Read it once as the person who will do the work, and once as the person who will approve it. If they would start different tasks from the same page, the scope lines are still soft.
A statement of work or a proposal can come after this page. Consultants often keep the commercial terms in a separate Doc so the team brief stays free of fee tables. That split is described in ClickUp for consultants. Agencies can reuse the same headings for every client Folder, which is the pattern in ClickUp for agencies.
How do you store the brief in ClickUp?
Create a Doc on the project List, or add a Doc view so the page stays attached to that location. Deleting a Doc view deletes the Doc. If you only wanted to hide the view, move the Doc first. That warning is in the Docs guide. It matters here because the brief is the page you will need when scope is questioned.
Then connect the writing to the work:
- Select a deliverable line and create a task from it. The task inherits a real sentence instead of a one-word title.
- Add a relationship between the Doc and the List or the milestone task, so you can jump either way.
- Comment on a paragraph when a line is still a question. ClickUp can assign that comment.
- Set a Doc owner. Help describes an owner as the creator or someone you add.
Save the Doc as a template after one project uses it without a rewrite of the headings. ClickUp templates include Docs on every plan. The next brief starts from that template, not from a blank page. Guests can use Doc templates. They cannot use Space templates.
Share the Doc with a client only when the out-of-scope lines are ready for them to see. On Free Forever, guests get full edit on shared items. On paid plans, permission-controlled guests can be view only or comment. Our Free vs Unlimited comparison records those guest rules. Put fees in an unshared Doc if the client should not read them.
Wikis are a different object. ClickUp's pricing comparison lists 1 wiki on Free Forever, Unlimited, and Business. Use the wiki for how your team writes briefs. Use an ordinary Doc for each project's brief so the wiki does not fill up with one-off pages.
What does a filled-in example look like?
This is a sample, not a client story. Replace every line.
Outcome: The new pricing page is live and matches the approved offer.
In scope: One page, the offer copy, and a short FAQ.
Out of scope: A billing-system change, translated pages, and a new logo.
People: Alex owns the List. Jordan approves the page before it is live.
Done: The URL is on the milestone task, and Jordan has moved that task to Done.
Open questions: Whether the FAQ includes the annual discount. Decide before copy starts.
That page is short enough to reread. The List then holds the tasks: outline, draft, design, review, publish. How to plan a project is the step that turns this page into dates and dependencies. Do not paste the whole plan back into the brief.
When is Notion the better place for the brief?
Notion is the stronger writing tool when the brief is part of a large wiki and the task list is secondary. Plus is $10 per seat/month. ClickUp is the better fit when the brief must stay attached to assignees and due dates. Prices were checked in October 2026. Unlimited, which most small teams use once guest permissions matter, is $7 per user/month billed annually ($10 monthly).
You do not need a paid ClickUp plan to write the brief. Docs are on Free Forever. Move up when storage, Spaces, or view-only guests block the share. Plan figures are in ClickUp pricing.
Write the outcome, three in-scope lines, and three out-of-scope lines. Save that Doc. The template is the headings you were willing to fill in, not a longer outline.
ClickUp
All-in-one work management for tasks, docs, goals and team collaboration, with a generous free plan.
Affiliate link. We may earn a commission at no extra cost to you. Read our affiliate disclosure
Frequently asked questions
What is a project brief?
It is a short document that says why the project exists, what is included, what is not, who owns it, and what done looks like. It is not the full task list.
How long should a project brief be?
Short enough that a new person can read it before the kickoff. One or two pages is enough for most small-team projects. A ten-page brief is usually hiding a missing decision.
Where should you keep a project brief in ClickUp?
In a Doc, on every plan. Add it as a view on the project List, or relate the Doc to the List. You can select text in the Doc and create a task from it.
Can a client see the brief?
Yes, if you share the Doc. On Free Forever, a guest has full edit on what you share. On paid plans you can set view or comment access. Keep internal pricing in a Doc you do not share.
Is a project brief the same as a statement of work?
No. A brief aligns the team on outcome and scope. A statement of work is the commercial agreement. Many teams write the brief first and then point the agreement at it.